Main stages of repair in the apartment or condo

Main stages of repair works in the apartment.

How to start repair works of the apartment?

The very first stage of the repair work of old apartments is the destruction and taking apart first off of the worn out walls https://engage.alaska.edu/uas/page.aspx?pid=534&dgs2366=3&rid2366=1204&tid2366=23275 and partition walls, removing the wall and ceiling finishing. This stage is one of the most "dirty" stages of the repair work.

One more among the most essential and "dirty" works is the window block replacement. It is essential to do this first of all since dirt and dust will be unallowable during following phases and it is restricted at all to open windows during painting and wallpaper works (big drops of the temperature level and moisture are unallowable). After installing windows and windowsills it is essential to load them instantly in polyethylene film and to cover windowsills in addition by the fiber board (in order to prevent scratches).

The following stage is circuitry. Electrical wiring can be installed in walls or along the flooring. Wiring is made inside the pipelines to make sure electrical safety and boost dependability. The pipe secures circuitry from external damages and permits to replace the wire completely without breaking walls and floor simply by inserting the new wire rather of the old one.

House Painting follows the circuitry. The regular mistake throughout the synchronised conducting of such works occurs when employees forget to lay out one of the cable televisions and home painters have currently plastered and ravelled the wall. As an outcome, extra works are essential to seal chases after on the ended up wall. The places of the feed switch and wall outlet location and their number must be thought-out in advance. The scheme of power wiring is normally included into the design project.

Later on the system must be ready to service in case of failures. In addition to the electrical wirings, the telephone cable television and the television cable are set out. The power cable need to not be laid out near the telephone and antenna cables to prevent sound pickup and disturbance. The most strange minute is laying out the TV cable television. In order to make 2 (or three) TV sets in the apartment the second cable is frequently simply "securely soldered" in parallel, so the cable resistance is reduced. As a result, the display screen quality is weakened, lots of programs can't be gotten and etc. In order to prevent such circumstance it is needed to invite an expert with special equipment. He will determine the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.

Painting is the most long-term process, that is why it is conducted concurrently in all facilities, if it is possible. Delays are linked with the technology. Each applied layer of the plaster (or filling in finishing) must dry completely before the work will continue.

Works in sanitary plans and the kitchen begin simultaneously with home painting. It is better to fulfill so-called "dirty" operate in the first place and concurrently. In accordance with the plan of the sanitary professional place welding, wall chasing and pipe run are carried out. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.

Then operates in sanitary arrangements are performed according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below stage is assembling ceiling and laying tiles on the floor. And at last other sanitary gadgets, mixers and devices are mounted.

After wiring, setup of rosette plates and terminal boxes the voltage is checked in all point. Ends of electrical wiring are insulated and set out into rosette plates. Sockets and breakers are not set up during this phase in order to save their surface look. The finish puttying of walls is conducted simultaneously. The highly specific control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that measures moisture of the material.

The following phase is the procedure of fill. Fill can be made with various products-- from normal masonry cement-sand mixture to self-aligning floorings. The advantage of the basic mix is its cheapness, the drawback is that such mix is much harder lined up at the level and the final dry time of such fill is 40 days, just then the next stage of the work with floor can be conducted, i.e. the duration is too long. Self-leveling self-aligning floors are a lot more expensive, but more technological. Aligning occurs nearly "instantly" i.e. fluid solution of mix is put out, then it runs and you receive the horizontal surface. The last dry time is 15 days i.e. you have significant time economy. The system "warm floor" is set up into the fill. If the so-called "damp processes" are inapplicable the innovation of the dry aligning (the fill innovation) is utilized bases for floors with adjustable floor battens are mounted.

After fill door boxes and door are installed. Plumbing Troubleshooting Guide Installation of doors need to take into the account thickness of future flooring covering. After setup the door can be taken off its hinges and removed till the end of repair work or packed into polyethylene movie to secure from damages. Concurrently ceiling can be painted and the tile can be laid in that facilities where it was planned. The tile should be laid on the definitely dry overlay.

Finishing of the flooring mounting depends on the prepared covering. In many cases (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to offer the close fixing of plywood and long-lasting service of the floor without squeak and bulging. The plywood offers the additional heat- and acoustic insulation. After installing of the plywood is finished, wallpaper for painting can be pasted on walls.

image

In properties where finish covering of the flooring is laminated floor covering or parquet stockpile, the ordinary wallpapers are pasted (not for painting) in the very first location. Then the floor covering is mounted.

If finish covering of the flooring is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The mentioned effect is linked just with such rushing procedure when the fantastic quantity of dust is produced. In spite of the reality that good flooring mills are geared up with the vacuum cleaner, the adequate quantity of dust is precipitated on surrounding subjects consisting of walls. Dust is extremely acerbic and is badly cleaned off. That is why in order not to harm wallpapers, they are pasted after scrambling and in order the parquet do not take in the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the primary works can be thought about to be ended up. It is left just to set up the plinths, ornamental aspects, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is necessary to keep in mind that the series of works was listed in general and can change depending on the guaranteed situation-- the variety of spaces in premise, your resources, peculiarities of the building of the multilevel facilities. It is based upon common sense and everyone capable of analysis can individually create such a sequence.